Truckstop Development, Parc Cybi, Holyhead

A detailed contour survey and palaeo-environmental sampling of peats and silts located at Parc Cybi, Holyhead, took place prior to and during groundworks at the site. The work helped to mitigate the impact of the proposed development on these deposits and minimise the need for costly excavation.

Scroll to Top